In 2026 Vancouver Renovate renovated a two-bathroom condo in downtown Vancouver, from demolition to final clean-up. The job took about 2.5 months and cost around $100,000.

Project at a glance
- Location: downtown Vancouver
- Home: condo with two bathrooms
- Year: 2026
- Time: about 2.5 months
- Cost: around $100,000
What we did
- Full demolition and clean-up
- Kitchen wall removed
- Kitchen remodelled with new cabinets
- Both bathrooms renovated
- New flooring
- Painting
- New doors and handles
- Pot lights, new switches and a new light fixture
- Appliance installation

The bathrooms
Both bathrooms were renovated as part of the same project.



Why this job took 2.5 months
A standard full condo renovation takes about 1 month. This project took longer because the scope was larger: a kitchen wall was removed, the kitchen was rebuilt with new cabinets, and both bathrooms were renovated.
Planning a condo renovation?
Condo kitchens and bathrooms start at $17,000 plus GST. Visit our showroom at 1075 Marine Dr #103, North Vancouver, or call 604-440-2171 for a quote. See our apartment and condo renovation page for prices and timelines.